Assignment -1 (To be done after studying the course material)

Course Code: MMPN-005

Course Title: Construction Works Supervision

Assignment Code: MMPN-005/TMA/2026

ENGLISH MEDIUM

Description

Assignment -1 (To be done after studying the course material)

Course Code: MMPN-005

Course Title: Construction Works Supervision

Assignment Code: MMPN-005/TMA/2026

Maximum Marks: 100 Last Date of Submission: May 31, 2026 (For June TEE), September 30, 2026 (For December TEE) Note: 1. For any question worth 5 marks the word limit is 200 words, for a 10 mark question it is 350 words.2. All questions are compulsory. All questions carry equal marks.

Q.1 a) Why is a Construction Supervisor called ‘First-Line Manager’?

b) Describe briefly the methods of execution of a construction project.

Q.2 a) Enumerate the responsibilities of a supervisor appointed by a client.

b) Mention the important documents which a contractor’s supervisor has to maintain on the site.

Q.3 a) Explain the following: (i) Fabrication Drawing (ii) Bar Bending Schedule

b) Why Specifications are necessary? What are the requirements of good specifications?

Q.4 a) Explain the importance of Conditions of Contract to a supervisor.

b) Please discuss the various items of variation in a cost estimation of a project.

Q.5 a) Please differentiate the following by taking a suitable example: (i) Project budget (ii) Revised project budget

b) Please discuss details of content of a contract for construction management.

Q.6 Write short notes on the following: a. Drawing register b. Cement register c. Steel register

Q.7 Mention the various important control procedures to maintain a quality requirement in a construction management.

Q.8 Explain in detail the different techniques of a consolidation in cohesive and non cohesive soils in a construction sites.

Q.9 List the various points to be checked in execution of a raft foundation for a construction project.

Q.10 Write a list of point to be checked in a painting and glassing work of a large construction office building.